Kris White online

Kris White about best invest

Myself Kris

OBJECTIVE: Consultant Drilling/Completion Supervisor

EXPERIENCE:
August 2005 to Present
Wellsite Drilling Consultant
Drilling 16000' gas wells near Rifle Colorado.
XTO ENERGY INC
Farmington Ave
Building K Suite 1
Farmington NM 87401

March 2005 to August 2005-HOLT CONSULTING LLC
Consultant Wellsite Drilling/Completion Supervisor
ENERGEN RESOURCES
2198 Bloomfield Highway,
Farmington NM

September 2003 to February 2005 - VAUGHAN CONSULTING, NEW TECH ENGINEERING & HOLT CONSULTING LLC
Consultant Wellsite Drilling/Completion Supervisor,
Cabot Oil & Gas Corporation
Dominion Plaza, 600 17th St. Suite 900 North, Denver, Colorado 80202
Phone: 303-226-9429 and Cell Phone: 303-868-6612, Terry Jackson.
Drilled & completed several gas wells in southwest Colorado and Wyoming.

March 2002 to August 2003
P.T. PATRINDO PERSADAMAJU
Jakarta, Indonesia
Production Manager, P.T. Patrindo Persadamaju at present producing + / - 600 bbl oil per day. One workover rig working full time going into wells the Dutch shut in back in 1961 when they left Indonesia. This work mostly drill out cement plugs top and bottom and return to production usually put on rod pump. One drilling rig drilling new wells 1500' to 2500'.

June 2001 TO January 15, 2002
Fairweather E & P Alaska
Anchorage, Alaska
Consultant Drilling/Completion supervisor for British Petroleum.

August 99 to June 2001 - HOLT CONSULTING
Bakersfield California

OCCIDENTAL OF ELK HILLS, INC
Tupman CA.
Consultant Drilling/Completion/ supervisor.

June 98 to AUGUST 99 - VAUGHAN CONSULTING LLC
Cut Bank, Montana USA
Consultant Company Man on following wells in Tunisia
CMS NOMECO TUNISIA Supervised building of location for drilling rig.
Drilled and completed Tarfa # 2 well, TD 2344 meters (7690.6 ft.)
ECUMED-Tunis, Tunisia
Drilled (1) 0ne directional well-Al Manzah # 1Kairouane Petroleum company, Tunis, Tunisia
Completed (2) two workovers.

December 97-June 98 Consultant Drilling Supervisor
Permintracer Petroleum LTD. - Jakarta, Indonesia
Direct hire as consultant operation manager (6) six month contract. Drill (1) one horizontal well in East Kalimantan Indonesia. Supervise coordinate and control preparations to drill (2) gas well in South Kalimantan Indonesia. Supervised road and location building across wet lands and thick pete moss.

August 97 - December 97 Consultant Drilling Superintendent
P.T. Bahary Rigindo Sarana- Jakarta, Indonesia
Drilled several directional and straight holes.
End of drilling contract Dec. 97.

Febuary 96 - July 97 Drilling Superintendent
P.T. Suribor (Ken Cooper)- Jakarta, Indonesia
Drilled (1) well for Arco in South Sulawesi, Indonesia-Drilled (2) Directional wells for Kondur Petroleum in Sumatera, Indonesia-Drilled (3) wells for Semco in East Kalimantan Indonesia.

December 92 - Febuary 96 Area Manager
P.T. Dimas Drillindo, Jakarta, Indonesia
Operation area Duri, Sumatera Indonesia, Field office
(4) Drilling Rigs - (5) Workover Rigs and supply labor for (4) Caltex well service rigs.All rigs contracted to Caltex-Total employees 750

Febuary 92 - November 92 Drilling/Workover Supervisor
Dole Enterprise-Oil Producer, Bakersfield California
Drilled (1) horizontal well to 11000 ft. - Numerous workovers/well service.

January 91-Febuary 92 Consultant Workover Supervisor
Lasmo-Kurau Sumatera, Indonesia
(1) year contract-completed several workovers and service several ESP wells.

June 90 - January 91 Workover Supervisor
Pool Company - Houston, Texas
Contracted through Pool-Intairdrill to Brunei Shell - Work involved plug and abandoments and gas lift completions.

June 89 - June 90 Tool Pusher
Well-Tech Inc, Bakersfield, California
One workover rig. General well service and workovers.

January 84 - June 89 Superintendent/Division Manager
Pyramid Oil Company - 1984-1987, Production/Drilling/Workover Superintendent
In charge of oil production 700 bod, drilling/well service/workover.
1987-1989, Division Manager Pyramid well service, Taft, California - (15) rigs-(Subsidiary) of Pyramid Oil co.

October 82 - January 84 Self Employed

Febuary 80 - October 82 Consultant Workover Supervisor
ARAMCO-Saudi Arabia-All phases of workover.

January 78 - Febuary 80 Operation Superintendent
Pool-Intairdrill - Libyan Operation - (7) Workover rigs involved in all phases of workover/well service and water well drilling.

1960-1978 Several oil field jobs, floors, derrick man, driller, tool pusher and rig manager. First international assignment April 1969 with Intairdrill in Libya.

EDUCATION
Languages: English And Indonesian
High School Graduate
Collage (3)Years Business Management Course
Well Control (Certified through 8/14/05)Expired
H2S Training 12/19/05
CPR & First Aid 4/9/05
Many other oilfield related courses

Both personal and professional references available on request.

Diggdel.icio.usStumbleUponFacebookLiveYahooMyWebNewsVineFurlBlinkListReddit
[X]